• Home
  • For Home
  • For Business
  • How It Works
    • How It Works
    • Return On Investment
    • Design
  • About Us
  • Get A Quote
  • FAQ
  • Contact Us

INSTALLATION FAQ

Who can install Solar Panels?
Any company can install Solar Panels, but you will only be able to receive the Feed-In-Tariff if your Solar Panels are installed by an MCS accredited installer such as Ecotec Renewables. As well as this, a non-MCS installer will not have the technical knowledge of a specialist renewables installer such as Ecotec Renewables and may not design a Solar System to give you maximum efficiency.

Do I need planning permission?
For most system installations, planning permission is not needed. This being said, it is always wise to check with your local authority to be sure. Some examples where planning permission may be needed is on listed building, in protected areas or on ground-mounted panels.

How long does an installation take?
Solar Panel Installation time can differ, but on an average domestic property we usually aim to complete installation within 1 or 2 days. We will be sure to schedule installation around your schedule to be sure that minimal disruption is caused. Access to the property will be needed to install the Solar Inverter, but other than this installation should be simple and quick.

address

contact

follow Ecotec

15 High Street, Green Street Green, Kent
BR6 6BG
01689 452 482
office@ecotecrenewables.co.uk